Mixed panel orders: build an item schedule the workshop can use

Combine the panels your business needs in one clear container schedule. Keep each construction and quantity identifiable from quotation to receiving.

Four overlapping woodgrain-faced fibreboard sheets with uniform brown core edges.
On this page

MIXED PLYWOOD & MDF ORDERS / FROM ITEM LIST TO RECEIVING

Build one mixed container around the panels your workshop needs.

A mixed plywood and MDF container can serve several furniture components, thicknesses and finishes in one order. Give each supplied construction its own item code, dimensions, quantity and unit. Carry that identity into the sample, quotation, production schedule and bundle label, so the receiving team can find the right panel when work begins.

CUZI’s minimum order is one container, with mixed loads available. You can start with the products and quantities you already know; identify the specifications still open. We can discuss the proposed mix, samples, packing and a named FOB or CIF port together.

  • Define each item: complete plywood or MDF construction, front/reverse and supplied work.
  • Show the demand: finished dimensions, sheet or part count and any item needed first.
  • Connect the references: physical sample, drawing revision and appearance master.
  • Plan the handover: production readiness, bundle labels and receiving checks.

Discuss my mixed panel order

When should a panel order use a separate SKU?

Create a separate stock-keeping unit (SKU), or item line, when a supplied difference changes how the panel is picked, processed or checked. A common project name or white decor can group several items, while their individual constructions remain visible. This keeps quotations comparable and prevents one component being substituted for another at packing.

Scroll horizontally to compare all columns.

Item identity: separate the construction from order allocation
Field that changesRecord on the item lineHow to handle the change
Substrate or corePlywood species/layer construction or MDF board grade/model.Give a different proposed construction its own line and sample reference.
Front and reverseFace/back veneer or overlay, grades, single/double facing and balancing reverse.Separate items if the supplied build-up or side treatment changes.
Thickness or formatNominal and finished gauge, length/width and agreed tolerances.Keep each different gauge/format identifiable, including cut parts.
Decor or finishPhysical colour/texture/sheen reference and complete supplied finish.Separate a new supplied decor or finish; record the appearance range.
Processing scopeCutting, routing, boring, edges and work included in the supply.Identify a differently processed part and its drawing revision.
Performance requirementRequired bond/emission or other method, conditions and product documents.Describe an alternative model separately if it changes the proposed specification.
Quantity, project or lotOrder allocation, required date, production lot and bundle references.Keep the product identity when the recipe is unchanged; track allocations and lots separately.

When only quantities change, update the schedule revision and keep the product code. Use a separate allocation for another project, and keep batch and pack references for each delivery.

Define the item before assigning the code.

Use short, stable codes beside a full description. Purchasing, production and receiving should be able to read the construction without decoding a long string. Give the schedule a revision/date and identify the drawing and sample used for each line. Keep a changed quote or approved alternative linked to the affected item.

For plywood, describe the face/back and full core or layer schedule, bond requirement, dimensions and supplied finish. For MDF, describe the board grade/model, front/reverse construction, complete finished gauge and any cutting or facing. Add the required emission method and destination documents to the proposed material, rather than treating a colour name as its specification.

One appearance master can connect several different panels.

For a coordinated white cabinet, compare carcass, door and back samples together. Choose the colour, texture, sheen and visible edges under the intended lighting, then save the finished samples for the order.

Attach a representative sample to each construction. Keep the common appearance master as a shared reference, and the panel/part samples as item references. Where edge band or workshop paint completes the component, identify who supplies it and include the finished edge or coating trial in the discussion.

WORKED BUYING EXAMPLE

Example: one white decor on three different items

Chosen three-line sheet schedule with separate construction and quantity units.

A joinery buyer needs carcass panels, flat door fronts and thinner backs for one programme. C1, D1 and B1 share a white appearance target but have different constructions and workshop responsibilities. The dimensions below are the proposed finished sheet dimensions used for the volume calculation.

Scroll horizontally to compare all columns.

Three-item schedule: 600 sheets across plywood and MDF
Item / constructionDimensions and quantityAppearance / work referenceNet panel volume
C1 — carcass plywood2440 × 1220 × 18 mm; 200 sheets. Selected plywood core, melamine face and reverse.White physical master, carcass drawing/revision, full faced-panel sample and edge-band trial.200 × 2.44 × 1.22 × 0.018 = 10.716480 m³.
D1 — MDF door panel2800 × 2100 × 18 mm; 160 sheets. Selected MDF model with melamine front/reverse.Same white target; separate door sample, edge/fitting trial and door drawing/revision.160 × 2.80 × 2.10 × 0.018 = 16.934400 m³.
B1 — MDF backing2440 × 1220 × 6 mm; 240 sheets. Plain MDF backing model.Workshop applies the white finish. Record backing drawing, coating responsibility and finished reference.240 × 2.44 × 1.22 × 0.006 = 4.286592 m³.

What this means for the order

The three lines total 600 sheets and 31.937472 m³ of net panel volume. Preserve each calculation when a quantity or gauge changes. This figure describes the listed material; the proposed packing layout, gross weights and transport limits still determine the load.

Use the same white reference for C1, D1 and B1, and review a sample of each construction and finish. Show any alternative core, facing or processing as a separate quotation line.

Add the quantities by item, with the right unit.

Calculate each item’s net volume as length × width × finished thickness × sheet count, using metres. Add the individual volumes so the different backing, carcass and door thicknesses and formats are included correctly.

List full sheets, finished parts and sets in their own units. Give dimensions and piece counts for cut parts, a cutting plan for workshop sheet orders and a component breakdown for sets.

Plan weight and packing alongside material volume.

Ask for the density or measured sheet weight of each finished panel. Include the facings in panel weight and record packing separately so the loading plan uses the right gross weights.

Ask for external bundle length, width and height, sheets per bundle, packing tare and gross weight. Identify which figures are estimates and which are measured for the proposed shipment. Use the sheet-volume and loading guide for the calculation and the packing information needed to take it further.

COMPONENT / SET / RESERVE

Convert the complete unit into individual component lines

For a separate chosen 200-unit cabinet programme, each unit needs two plywood sides, one MDF front and one thinner MDF back. The following dimensions describe rectangular finished parts for quantity bookkeeping. Their actual full construction, drawings, fitting/finish and limits need the same selected revision as the quotation.

Scroll horizontally to compare all columns.

Chosen 200-unit component and reserve schedule
ItemChosen quantity / recordSupply decision
K-C / two sides per unit720 × 560 × 18 mm; 200 × 2 = 400 installed parts. Chosen 2% reserve adds 8, giving 408 parts.Identify each handed side, material/grain direction, holes/joints, full plywood/facing/reverse and included machining/edge work.
K-D / one front per unit720 × 600 × 18 mm; 200 installed parts. Chosen 2% reserve adds 4, giving 204 parts.Keep the MDF/facing/reverse, decor/edge master and actual finished front/fitting trial with its own item.
K-B / one back per unit720 × 600 × 6 mm; 200 installed parts. Chosen 2% reserve adds 4, giving 204 parts.Identify the board/finish, receiving groove or fixing detail and the stage of workshop work included.

The requirement is 800 installed parts plus 16 selected reserve parts = 816 parts. Installed rectangular area is 161.28 + 86.40 + 86.40 = 334.08 m²; the selected reserve adds 6.6816 m², giving 340.7616 m². Under the stated gauges, the rectangular part-volume total is 5.0761728 m³ including reserve. Record the actual supplied gauge and shape for the order.

Request full-sheet allocation and cutting yield separately when purchasing sheets. When purchasing finished parts, price the agreed completed parts/sets and named reserve positions. The selected 2% allowance is an input to this programme calculation; the actual project determines its reserve quantities and replacement arrangement.

Use the limiting component to count complete sets

Chosen available-part observation after the stated receiving/workshop checks: 390 K-C sides, 198 K-D fronts and 210 K-B backs. Record only the parts available at that stage in this calculation; material still held or awaiting work remains identifiable elsewhere in the schedule.

Scroll horizontally to compare all columns.

Chosen component availability and complete-set count
ItemChosen quantity / recordSupply decision
K-C sides390 ÷ 2 = 195 complete units before other components are considered.Relative to 400 installed sides, 10 more are needed; relative to the selected 408 total, 18 are needed.
K-D fronts198 ÷ 1 = 198 units by this component alone.Relative to 200 installed fronts, 2 more are needed; relative to the selected 204 total, 6 are needed.
K-B backs210 ÷ 1 = 210 units by this component alone.This exceeds the selected 204 back requirement by 6; keep those parts separately allocated.

Complete readiness is min(195, 198, 210) = 195 units. Those units consume 390 sides, 195 fronts and 195 backs, leaving 0 sides, 3 fronts and 15 backs at the observed stage. The combined 798 available pieces therefore support five fewer complete units than the 200-unit target.

Keep handedness, appearance grouping and fitting/finished revision in the set record where they affect interchangeability. Allocate selected reserve positions separately from the parts consumed by installed sets, then record the remaining shortage or surplus on each SKU. Material for a different finish, hand or revised drawing needs its own allocation review.

Make the first-needed item visible in the schedule.

A mixed order works best when its individual production stages are understood. Record when each sample or drawing decision is due, the proposed production-complete date, the common dispatch plan and the buyer’s required receiving date. Mark the component needed first by the workshop and explain whether the remaining items must arrive with it.

CUZI’s regular production lead time is 10–15 days. Confirm the schedule for the full mix, including special facings, processing and samples, then add shipping and receiving time.

Agree a change on the affected lines.

If one item is delayed, review the options with its quantity, specification and commercial effect visible. A proposed substitute should have its own construction/sample reference; a partial quantity or different dispatch arrangement needs an updated schedule and quotation. Keep the agreed revision with purchasing, production and the packing team.

Before a repeat load, check the retained sample, model, source, decor and drawing revision against the new order. The repeat-order change-control guide helps carry an accepted item into the next purchase without losing the changes discussed after the first delivery.

Coordinate readiness and changes on every line

Keep the selected drawing/material/sample version, quantity and current stage together. The common container proposal depends on the items required for that dispatch and the actual packing, inspection and shipping arrangement. A line ready for machining and a packed/released line represent different stages.

Scroll horizontally to compare all columns.

Four gates in a mixed-order line register
ItemChosen quantity / recordSupply decision
Selected requirementSKU and drawing revision, full model/construction, dimensions/stage/limits, physical appearance and trial reference, quantity/unit.Make open selections and separately proposed alternatives visible before production allocation.
Current readinessMaterial/production/processing/inspection/packing stages, actual dates, held or remaining quantities and the first-needed item.Coordinate the complete-set or dispatch requirement with the available stage of every line.
Changed itemOriginal/revised construction, drawing, finish or quantity; affected sample/trial/data and net/pack schedule revisions.Record the chosen version and review the other components affected by fit, appearance or quantities.
Dispatch and receivingFinal item/lot/pack contents, external dimensions/gross scopes, actual loading/verification and named delivery/receiving arrangement.Reconcile ordered, packed, received and released quantities by item and unit.

CUZI’s regular production lead time is 10–15 days. Discuss readiness for the selected mix and finishing/processing scope, then add the actual packing, dispatch, transport and receiving stages. If one required line changes or remains held, review the complete programme and any separately proposed split arrangement before confirming the revised dispatch plan.

Use the same item references in production and packing.

Use the accepted item codes on the proposed packing list. Reconcile ordered, packed and physically received quantities by line, then record any quality hold separately. A correct overall sheet count can hide a shortage of one component and an excess of another.

Scroll horizontally to compare all columns.

Illustrative receiving check: the same total can hide the wrong mix
ItemOrder / proposed packingPhysical receiving observationProduction status
C1 — carcass200 ordered; 200 listed in the proposed packing schedule.200 physically received; 4 have a recorded condition issue.196 released; 4 held for review. No physical count shortage.
D1 — door160 ordered; 160 listed in the proposed packing schedule.156 physically received, checked against item and pack references.4-sheet quantity discrepancy; record it separately from quality observations.
B1 — backing240 ordered; 240 listed in the proposed packing schedule.244 physically received, with the extra sheets identified.4 extra sheets require reconciliation; they do not replace D1.

The delivery still totals 600 sheets, but the mix needs attention: four door sheets are missing, backing sheets are extra and some carcass sheets are held. Record each item’s count, condition and agreed next step before allocating it to production.

Use the incoming-panel inspection guide for observations and the quality issue record for an affected item or lot. A condition concern should retain its sample/drawing and pack references as well as the quantity involved.

ONE ITEM REFERENCE THROUGH INSPECTION, PACKING AND RECEIVING

Keep the ordered panels connected to the shipment quantities.

A clear mixed-order schedule gives purchasing and receiving the same answer to “which panels are coming?” ECQA's inspection of 100% birch plywood records three thickness lines at 2500 × 1250 mm. Use the order and production-status fields below to organise your own mix, then carry the completed quantities into the packing and dispatch records.

Scroll horizontally to compare all columns.

ECQA · panel quantities and workmanship sampling at inspection
Panel itemOrderedAvailable at inspectionUnfinishedWorkmanship checked
21 mm all-birch15961596023
24 mm all-birch13761375120
30 mm all-birch25482547137

Order total: 5,520 panels. Available at inspection: 5,518. Unfinished: 2. Workmanship checked: 80. The report records PASS, with 0 critical, 0 major and 2 minor workmanship findings. Those 2 minor findings and the 2 unfinished panels describe different checks; retain each field under its own heading.

The workmanship count identifies the panels checked in that inspection. Available-at-inspection quantities describe production status at that point. The final packed and dispatched quantities belong in the shipment file, with any remaining work or revised allocation carried against the affected item.

Read the ECQA quantity and inspection record · View the birch packing and quantity details

Give each quantity a stage and an item reference.

Scroll horizontally to compare all columns.

Fields to carry from the purchase line to the receiving record
StageQuantity and identificationComplete the handover
Order & revisionOrdered sheets or parts by item, full construction, dimensions and selected revision.Agree the mix, price unit, first-needed item and production/receiving dates. Keep a changed quantity or substitute on the affected line.
Production & inspectionAvailable and unfinished counts, inspected quantity, findings and follow-up work.Confirm completion and the agreed checks before the item enters its dispatch allocation.
PackingPack ID, item/lot contents and counted sheets or parts in each full or partial pack.Add labels, outside dimensions, gross mass and protection. Reconcile pack contents with the chosen shipment quantities.
DispatchFinal shipped quantity by item, packing-list revision and shipment reference.Record any balance left behind and its proposed next dispatch. Share the final pack list and item documents with receiving.
ReceivingPhysically received count, condition observations and any quantity held from workshop use.Locate the affected pack/part and reconcile it with the dispatch line. Carry the agreed action and released quantity into the workshop plan.

The report describes protected, strapped packs and notes pallet labels to be added at shipping. For your mixed load, make each label readable against its item line and pack contents. Plywood, MDF, faced boards and machined parts should retain their own units, construction and protection requirements within the common shipment schedule.

Use the recorded package dimensions and weights for the packing discussion, finished-panel inspection checks for the selected construction, and the receiving inspection guide for the arrival record.

Request the packing file for each selected thickness.

These routes retain the all-birch construction and 1250 × 2500 mm sheet reference. Include your ordered counts, proposed packs, unfinished balance and first-needed items in the inquiry.

All-birch packing and quantity requests
Selected itemContinue
21 mm all-birch · 1250 × 2500 mmRequest the 21 mm shipment file
24 mm all-birch · 1250 × 2500 mmRequest the 24 mm shipment file
30 mm all-birch · 1250 × 2500 mmRequest the 30 mm shipment file

For a combined plywood and MDF programme, send the complete item list, quantities and named FOB or CIF port. CUZI supports one-container orders with mixed loads; regular production is 10–15 days, with the mix, dispatch date and shipping time agreed for your order.

Plan my plywood and MDF shipment

Make the bundle label useful at the receiving door.

Agree whether each item has separate bundles or shares a mixed bundle. Separate packs make picking clearer; a mixed pack needs an item breakdown and position record that the receiving team can follow. Discuss the first-needed component with the proposed unloading and storage arrangement.

Scroll horizontally to compare all columns.

Packing brief: connect each bundle to the workshop schedule
Packing fieldInclude in the proposalReceiving decision
Bundle identityPack number, schedule revision, item code(s), model/lot and sheet or part count.Match the visible label with the packing list and purchase line.
External dimensionsPacked length/width/height, pack count and the proposed load layout.Check handling access, storage footprint and the delivery arrangement.
Mass basisNet material mass, packing tare and package gross mass, with estimate/measurement basis.Give the actual package dimensions and gross mass to the handling/logistics team.
Surface / edge protectionProposed protection for faces, edges and corners; identification of finished or fragile components.Keep protection and care instructions with the selected panel/finish.
Mixed-bundle accessItem breakdown and position, lifting/unpacking plan and first-needed item.Plan where opened packs and different items will be placed.
Shipment recordsFinal pack list, item quantities, shipment/container reference and agreed documents.Connect arrival counts and observations to the correct order and delivery.

The net 31.937472 m³ in the example is only one input. External packaging, actual weights, distribution, securing, equipment and transport limits need their own loading proposal. Keep the planned layout with the logistics provider. IMO’s CTU packing guidance covers packing/securing and the receiving/unpacking chain.

For container gross mass, packing and securing material and the container’s tare are additional to the panel material. Add container tare at the shipment level, not repeatedly to every bundle. The shipment weighing/verification arrangement should be coordinated with the responsible shipper and logistics provider; see IMO’s container gross-mass guidance.

Keep a working sample for each component.

Connect the retained sample to the item code, complete supplied construction, drawing revision and physical appearance master. Use the sample to answer the workshop’s actual question: carcass cutting and edge treatment, a flat door’s fitting and finish, or a backing’s cutting and coating. Request the relevant product data for the proposed model alongside the physical trial.

C1 — faced plywood for carcasses

Review the white melamine face, selected reverse and plywood core together. Keep the finished gauge, intended joint and cut edge with the sample. The melamine-faced plywood page describes the supply route.

Request a carcass panel sampleRequest carcass panel data

D1 — melamine MDF for flat fronts

Compare the supplied front/reverse, finished thickness and matching edge. Include the actual hinge/boring and complete-front fit in the trial. Explore melamine MDF, or identify a separately priced HPL-faced MDF alternative when the surface requirement changes.

Request a flat-front MDF sampleRequest flat-front MDF data

B1 — plain MDF for workshop-finished backs

Keep the plain MDF model, cut backing dimensions and actual white-coating reference together. Record the workshop’s preparation and finished observations rather than describing a raw board as a supplied white finished panel.

Request a backing MDF sampleRequest backing MDF data

Plan a CUZI mixed container by item.

The minimum order is one container, and mixed panels are possible. Combine the materials your business needs while keeping individual constructions and quantities identifiable. Start with a wholesale MDF schedule, a plywood programme or both, then discuss the proposed production and packing plan.

Commercial Plywood

Nominal thickness
3–30 mm
Core / substrate
Poplar, birch or eucalyptus
Face / back grade
BB/CC; C/D
Emission grade
E1; E0
View specificationsRequest a sample of Commercial Plywood

Plain MDF

Nominal thickness
2.5–35 mm
Board grade
Standard; moisture-resistant (9–25 mm); fire-retardant (9–25 mm)
Emission grade
Standard: E0 / E1 / E2; moisture-resistant and fire-retardant: E0 / E1
View specificationsRequest a sample of Plain MDF

Commercial plywood is available in 3–30 mm, with poplar, birch or eucalyptus cores, BB/CC or C/D face/back options and E0/E1 emission options. Regular plywood formats include 1220 × 2440, 1250 × 2500 and 1525 × 3050 mm; formats such as 1220 × 3050 and 1250 × 3660 mm are on request. Specify the actual construction, grading basis and required method for each quoted item.

Plain MDF is available in 2.5–35 mm. Regular MDF formats are 1220 × 2440 and 2100 × 2800 mm; 1220 × 3050, 1830 × 3660 and 1220 × 3660 mm are on request. Facing and processing add their own finished-gauge and model selections. Compare selected panels side by side before combining them in the inquiry.

Keep commercial terms at the top of the schedule.

Include the named shipment port for FOB or named destination port for CIF, required receiving date and quantities by unit. Regular production is 10–15 days; agree the schedule for the mix and add transport time. Samples are free; you pay courier freight, which is credited in full against your formal order.

Discuss quantities and packing for each item in the mixed-container quote. Use the order worksheets to keep the quotation, packing list and receiving records aligned.

Keep these details with your inquiry.

  1. Item code and complete construction: plywood/core or MDF model, front/reverse, required methods and supplied work.
  2. Dimensions and demand: nominal/finished gauge, length/width, tolerances, quantity/unit, finish and processing scope.
  3. Working references: retained sample, shared appearance master, drawing revision and separately described alternatives.
  4. Shipment and receiving: proposed bundle labels, pack dimensions/gross mass, required dates and ordered/packed/received reconciliation.

A short outline to copy into your inquiry

Project / schedule revision:
Named FOB shipment port or CIF destination port / receiving date:
Item code / component / proposed panel and full construction:
Finished dimensions / tolerance / quantity and unit:
Front / reverse / decor master / supplied processing and workshop work:
Sample / drawing revision / required product data:
First-needed item / proposed production and dispatch dates:
Bundle allocation / pack labels, external dimensions and gross weights:

Repeat the item fields for each line. Leave open selections visible so the proposed options can be priced separately. Prepare your inquiry files with the schedule, relevant drawings and sample references. The complete RFQ checklist provides the wider material and delivery fields.

Request a mixed-container quotationOpen the editable RFQ outline

For the next stages, download the quotation comparison record to compare offers, and the receiving checklist to record observations by item/pack. Keep your item schedule beside these records and carry its accepted revision forward.

Bring the set and its item lines into the same inquiry

Send the complete-unit breakdown, selected constructions and drawings, quantities by item/unit, reserve allocation and first-needed components. Request the working references and proposed line/packing schedule needed for the programme.

Questions buyers ask about mixed plywood and MDF orders

Can plywood and MDF share one container order?

Yes. CUZI’s minimum order is one container, with mixed loads available. Send the item constructions, dimensions, quantities/units and named FOB/CIF port. Agree the selected mix, packing and production schedule in the quotation.

Can similar items share one line to simplify the order?

Keep separate lines when the supplied specification changes. You can group the lines under one project while preserving the information required for picking and inspection. Quantity or project allocation alone can remain a separate field under the same unchanged product identity.

Can sheet counts, parts and sets be combined in the schedule?

Yes, with a clear unit and dimensions on each line. Keep full-sheet purchasing separate from workshop cutting yield. A set needs its component breakdown; calculate net volume from the dimensions and counts of the actual sheets or parts.

Does one white decor sample approve all three components?

A shared physical master can define the appearance target. Keep separate construction and working samples for the carcass, door and back, including their reverse, edges and actual coating or fitting trial. Record who supplies each part of the final finish.

Does the calculated CBM confirm how much will fit in a container?

Net panel volume describes the listed material. Confirm external pack dimensions, package gross weights, load layout, securing and applicable transport limits with the proposed shipment. Keep measured or estimated mass and packing information distinct from the geometric calculation.

Does 10–15 days include delivery to my workshop?

The regular lead time is for production. Confirm item readiness and the common dispatch plan for the mix, then add transport and receiving time. Give the required receiving date and identify the item needed first.

How should an approved substitute be recorded?

Revise the affected line and record the changed fields, sample/acceptance reference and quantity. Keep the original and revised schedules identifiable so the quotation, production and packing follow the intended version.

How do I record physically received sheets that are held for review?

Include held sheets in the delivered count, then record their condition and the quantity ready for production separately. Keep the pack reference, photos and agreed next step with each held item.

How can nearly enough individual parts still leave incomplete sets?

Count the parts required per unit and calculate the available complete units for each component. The limiting correctly matched component determines the complete-set count at that stage.

How should selected reserve parts enter the mixed schedule?

Allocate reserve quantity by component, hand, finish and relevant drawing position. Keep installed consumption, remaining reserve, shortage and surplus visible on the item line.

Does a finished-part volume calculation establish the raw sheet order?

Use finished dimensions and piece counts for component quantities. To buy sheets, also plan the sheet format, trim, saw kerf, grain direction, cutting layout and spare allowance.

What happens if a required component changes before dispatch?

Retain the original and revised line versions, review affected fit/appearance/trial/data and quantities, then update the pack and dispatch/receiving proposal against the selected programme.

What does available at inspection mean for the shipment schedule?

It records production status when the inspection takes place. Keep unfinished quantities and inspection findings in their own fields, then confirm the final packed and dispatched quantities by item and pack reference. The ECQA quantity record shows how these fields connect.

How do I track a partial pack or an item left for the next dispatch?

Record the actual pack contents and shipped count under the chosen item and packing-list revision. Keep the ordered balance and proposed next dispatch on the affected line. Reconcile each delivery with its final pack list before updating receiving and workshop quantities.